Relocation and Reinstallation of Protection Equipment on the Part West of SSE ChNPP Guarded Perimeter
Period: 2008 -2010
Customer: SSE ChNPP
The following works are being performed within the framework of the project:
- development and approval of project documentation covering design and survey works;
- supply of materials and certified equipment required for the construction;
- dismantling of existing equipment;
- installation and setup including the upgraded part of SSE ChNPP physical protection system commissioning.