Relocation and Reinstallation of Protection Equipment on the Part West of SSE ChNPP Guarded Perimeter

Period:  2008 -2010
Customer: SSE ChNPP

The following works are being performed within the framework of the project:

  • development and approval of project documentation covering design and survey works;
  • supply of materials and certified equipment required for the construction;
  • dismantling of existing equipment;
  • installation and setup including the upgraded part of SSE ChNPP physical protection system commissioning.