Project for Rivne NPP Unit 1 In-Depth Safety Assessment: Support to RNPP During The Surveys Performed to Obtain Detailed Data on Cable Layouts
Period: 2006-2007
Customer: Pacific Northwest National Laboratory (PNNL), USA
Beneficiary: SS Rivne NPP
The following activities were performed:
- development and approval of the task order (as a part of contractual documents under the project);
- development and approval of Reports D1.1 and D1.2 ‘Project Manual’ (draft and final versions, correspondingly);
- development and approval of Report D2.1 ‘Preliminary List of Cables’;
- development of Russian version of Draft Report D2.2 ‘Final List of Cables’. Partial translation of the Draft Report into English.
Contact:
Director of Safety Analysis Laboratory
Oleg I. Zhabin
Tel./Fax: +38 044 559 66 07
e-mail: sal@i.com.ua