Category: 2010-2011
-
Development of Revised STP 0.08.032-2001 Enterprise Standard Draft “Decommissioning. Comprehensive Engineering and Radiation Survey of NPP Power Unit. Contents and Procedure for Conduction”
Period: 2009 Customer: SS “Scientific and Technical Center” / SE NNEGC “Energoatom” The work objective is to bring the enterprise standard in line with the active regulatory, organizational and technical...
-
Creation of electronic explications of main body premises of the ChNPP 1st stage
Period: 2010 Customer: SSE ChNPPWithin the framework of electronic explications creation of main body premises of the 1st stage the following actions were carried out: comparative analysis of existng plans,...
-
Development of engineering documentation for general maintenance of pulse sefety device of pressure condencer of «Sempell» firm. Evaporating apparatus and condencer degasator for SE Khmelnitsky NPP
Period: 2010 Customer: NNEGC SE KhNPP The development objective of engineering documentation set is providing SE KhNPP with repair documentation required for quality service, equipments repair and ensuring their safety...