-
Basic Safety Research of A Facility Damaged by An Accident
Period: 2003-2004 Customer: Nuclear Safety Research Association of Japan (NSRA) Research objective: carry out experiments on comprehensive, large-scale and long-term decontamination of the Shelter Object’s contaminated premises; determine surface contamination...
-
Basic Research of Activities to Recover A Construction and Environment Damaged by An Accident
Period: 2003-2004Customer: Nuclear Safety Research Association of Japan (NSRA) Objective: determine changes in activity during irradiation by reactor neutrons, identify content of the elements, which irradiation results in formation of...
-
Development of Radiation Protection Program for The Chornobyl NPP at The Final Stage of Closure
Period: 2003-2004 Customer: BNFL, UK Beneficiary: SSE Chornobyl NPP The project objective was to develop the document determining structure and description of the SSE ChNPP activity in the area of...
-
Development of Inventory Database for Chornobyl NPP Radioactive Waste
Period: 2003-2004 Customer: DTI, NNC (UK) Beneficiary: Chornobyl NPP The purpose of this project was to provide an inventory database for the radioactive waste accumulated as a result of Chornobyl...
-
Draft In-depth Safety Assessment of Rivne NPP Unit 1 – Impact of Limited External Hazards (Fires, Floods, Earthquakes, etc.) – Part 1
Period: 1999 – 2003 Customer: Pacific Northwest National Laboratory (PNNL), USA Beneficiary: Rivne NPP The objective of this project was to identify the stability of Rivne NPP Unit 1 against...
-
Level 1 Limited Probabilistic Safety Analysis (PSA) of Khmelnitskiy NPP Unit 1 – Part 1
Period: November 2001 – March 2003 Customer: Pacific Northwest National Laboratory (PNNL), USA Beneficiary: SS Khmelnitskiy NPP Generally, the project was performed to determine a frequency of Khmelnitskiy NPP Unit...